• Data Explorer | ShenZhong Link to revolutionize connectivity in the Greater Bay Area

    2024-06-30 23:56:59 点此关注西非在线更多资讯

    After seven years of construction, the ShenZhong (Shenzhen-Zhongshan)Link, a monumental cross-sea infrastructure project, is set to open to traffic this Sunday at 3 p.m. This groundbreaking project connects the cities on the eastern and western sides of the Pearl River Estuary, significantly enhancing transportation and economic integration within the Guangdong-Hong Kong-Macao Greater Bay Area (GBA).

    Travel Guidance:

    From Shenzhento Zhongshan, the travel time is slashed from two hours to approximately 30 minutes.

    Total Length: 24 kilometers, featuring a 6.85-kilometer sea tunnel and a 17.2-kilometer above-sea bridge section.

    Toll Rates:

    Entireroute: 66 RMB(9.08USD ) for cars with no more than nine seats.

    Eastern Island to Western Island: 27 RMB.

    WesternIsland to Wanqingsha Interchange: 23 RMB.

    Wanqingsha Interchange to Hengmen Interchange: 6 RMB.

    Located in the core area of the GBA, the ShenZhong Link is positioned 30 kilometers south of the Humen Bridge and 31 kilometers north of the Hong Kong-Zhuhai-Macao Bridge. It begins at the ShenzhenAirport Interchange, extends westward over the Lingdingyang sea area, and connects to the NanZhong (Nansha-Zhongshan) Highway through the Wanqingsha Interchange, ending in Zhongshan City's Ma'an Island.

    Reporter | Eastbrook

    Poster |Mia

    Editor | Olivia, Will, Hannah

西非在线  
电话:00225 04030000   地址:26 B.P. 489 ABIDJAN 26 COTE D'IVOIRE